Evolutionary classification of protein domain structures
alpha arraysalpha-helix arrays with mainly perpendicular helices
alpha bundlesalpha-helix bundles with mainly parallel helices
alpha superhelicesrepeating alpha-helix hairpins form a superhelix
alpha duplicates or obligate multimersalpha duplicates or monomers associate together to form a compact domain
alpha complex topologyalpha domain with complex and unique topology that cannot be described as array or bundle or superhelix
beta barrelssingle beta-sheet folded upon itself to form a barrel

Refs: Structure 14, 1489-1498; Current opinion in structural biology 18, 358-365




Representatives:
e3j9zLM1[LM:1-114]
nonrep
Image
Pymol
Jmol Links:
PDB,
SCOP,
CATH, PubMed,
DOI
50S ribosomal protein L19 ; ELECTRON MICROSCOPY
e4v79BP1[BP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ELECTRON MICROSCOPY
e4v7aBP1[BP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ELECTRON MICROSCOPY
e4v7bBP1[BP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ELECTRON MICROSCOPY
e4v7cBR1[BR:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ELECTRON MICROSCOPY
e4v7dAS1[AS:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ELECTRON MICROSCOPY
e4v7iAP1[AP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ELECTRON MICROSCOPY
e4v7jAT1[AT:1-135] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.3Å
e4v7jBT1[BT:1-135] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.3Å
e4v7kAT1[AT:1-135] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.6Å
e4v7kBT1[BT:1-135] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.6Å
e4v7lBT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.000Å
e4v7lDT1[DT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.000Å
e4v7mBT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.400Å
e4v7mDT1[DT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.400Å
e4v7pBP1[BP:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.514Å
e4v7pCP1[CP:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.514Å
e4v7sBP1[BP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.250Å
e4v7sDP1[DP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.250Å
e4v7tBP1[BP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.194Å
e4v7tDP1[DP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.194Å
e4v7uBP1[BP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.100Å
e4v7uDP1[DP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.100Å
e4v7vBP1[BP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.289Å
e4v7vDP1[DP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.289Å
e4v7wBT1[BT:1-132] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.20Å
e4v7wDT1[DT:1-132] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.20Å
e4v7xBT1[BT:1-132] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.00Å
e4v7xDT1[DT:1-132] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.00Å
e4v7yBT1[BT:1-132] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.00Å
e4v7yDT1[DT:1-132] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.00Å
e4v7zBT1[BT:1-132] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.10Å
e4v7zDT1[DT:1-132] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.10Å
e4v83BP1[BP:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.5Å
e4v83DP1[DP:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.5Å
e4v84BP1[BP:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.4Å
e4v84DP1[DP:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.4Å
e4v85BT1[BT:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.2Å
e4v87AR1[AR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.000Å
e4v87DR1[DR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.000Å
e4v89BT1[BT:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.7Å
e4v8aAT1[AT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.90Å
e4v8aBT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.90Å
e4v8bBR1[BR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.000Å
e4v8bDR1[DR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.000Å
e4v8cAR1[AR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.300Å
e4v8cBR1[BR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.300Å
e4v8dBR1[BR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.000Å
e4v8dDR1[DR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.000Å
e4v8eAR1[AR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: OHX ; X-RAY DIFFRACTION 3.200Å
e4v8eCR1[CR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: OHX ; X-RAY DIFFRACTION 3.200Å
e4v8fAR1[AR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: OHX ; X-RAY DIFFRACTION 3.000Å
e4v8fDR1[DR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: OHX ; X-RAY DIFFRACTION 3.000Å
e4v8gBT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; X-RAY DIFFRACTION 3.000Å
e4v8gDT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; X-RAY DIFFRACTION 3.000Å
e4v8hBT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.100Å
e4v8hDT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; X-RAY DIFFRACTION 3.100Å
e4v8iBT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.700Å
e4v8iDT1[DT:1-130] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.700Å
e4v8jBT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.9Å
e4v8jDT1[DT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.9Å
e4v8nBT1[BT:1-136] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 3.10Å
e4v8nDT1[DT:1-136] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 3.10Å
e4v8oBT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 3.80Å
e4v8qAT1[AT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 3.10Å
e4v8uBT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 3.70Å
e4v8uDT1[DT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 3.70Å
e4v8xBT1[BT:1-136] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 3.35Å
e4v8xDT1[DT:1-136] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 3.35Å
e4v90BT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 2.95Å
e4v95BT1[BT:1-132] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.200Å
e4v95DT1[DT:1-130] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.200Å
e4v97BT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 3.5Å
e4v97DT1[DT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 3.5Å
e4v9aBR1[BR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.2999Å
e4v9aDR1[DR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.2999Å
e4v9bBR1[BR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.100Å
e4v9bDR1[DR:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.100Å
e4v9cBP1[BP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.300Å
e4v9cDP1[DP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.300Å
e4v9dCP1[CP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.000Å
e4v9dDP1[DP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.000Å
e4v9hBT1[BT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.857Å
e4v9iBT1[BT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.3Å
e4v9iDT1[DT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.3Å
e4v9jBT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.86Å
e4v9jDT1[DT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.86Å
e4v9kBT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.497Å
e4v9kDT1[DT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.497Å
e4v9lBT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.5Å
e4v9lDT1[DT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.5Å
e4v9mBT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.983Å
e4v9mDT1[DT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.983Å
e4v9nBT1[BT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.400Å
e4v9nDT1[DT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.400Å
e4v9oAP1[AP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.9Å
e4v9oCP1[CP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.9Å
e4v9oEP1[EP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.9Å
e4v9oGP1[GP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.9Å
e4v9pAP1[AP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.9Å
e4v9pCP1[CP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.9Å
e4v9pEP1[EP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.9Å
e4v9pGP1[GP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.9Å
e4v9qAP1[AP:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.4Å
e4v9qCP1[CP:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.4Å
e4v9rBT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.000Å
e4v9rDT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.000Å
e4v9sBT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.100Å
e4v9sDT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; X-RAY DIFFRACTION 3.100Å
e1vvjRT1[RT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.260Å
e1vvjYT1[YT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.260Å
e1vy4BT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.600Å
e1vy4DT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.600Å
e1vy5BT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.550Å
e1vy5DT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.550Å
e1vy6BT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.900Å
e1vy6DT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.900Å
e1vy7BT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.800Å
e1vy7DT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.800Å
e4w29BT1[BT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.8Å
e4w29DT1[DT:1-117] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.8Å
e4w2eT1[T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.890Å
e4w2fBT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.400Å
e4w2fDT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.400Å
e4w2gBT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.550Å
e4w2gDT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.550Å
e4w2hBT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.700Å
e4w2hDT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.700Å
e4w2iBT1[BT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.700Å
e4w2iDT1[DT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S Ribosomal Protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.700Å
e4wf1BP1[BP:2-115] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.090Å
e4wf1DP1[DP:2-115] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.090Å
e4wpoAT1[AT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.800Å
e4wpoCT1[CT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.800Å
e4wqfAT1[AT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.790Å
e4wqfCT1[CT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.790Å
e4wquAT1[AT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.800Å
e4wquCT1[CT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.800Å
e4wqyAT1[AT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.800Å
e4wqyCT1[CT:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.800Å
e4wweS1[S:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH
e4wwtS1[S:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH
e4wwwRP1[RP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.0Å
e4wwwYP1[YP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.0Å
e4xejAL191[AL19:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
; X-RAY DIFFRACTION 3.8Å
e4xejBL191[BL19:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
; X-RAY DIFFRACTION 3.8Å
e4y4o1T1[1T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: ARG,MG,MPD ; X-RAY DIFFRACTION 2.300Å
e4y4o2T1[2T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: ARG,MG ; X-RAY DIFFRACTION 2.300Å
e4y4p1T1[1T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.500Å
e4y4p2T1[2T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.500Å
e4ybbCQ1[CQ:2-115] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.000Å
e4ybbDQ1[DQ:2-115] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: PEG,PG4 ; X-RAY DIFFRACTION 2.000Å
e2zjpM1[M:2-109] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; ligands: MG ; X-RAY DIFFRACTION 3.700Å
e2zjqM1[M:2-109] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; X-RAY DIFFRACTION 3.3Å
e2zjrM1[M:2-109] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S RIBOSOMAL PROTEIN L19 ; ligands: MG ; X-RAY DIFFRACTION 2.91Å
e3j9yP1[P:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ELECTRON MICROSCOPY
e3j9wBS1[BS:5-118] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein bL19 ; ELECTRON MICROSCOPY
e4tuaRT1[RT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.400Å
e4tuaYT1[YT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.400Å
e4tubRT1[RT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.600Å
e4tubYT1[YT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.600Å
e4tucRT1[RT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.600Å
e4tucYT1[YT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.600Å
e4tudRT1[RT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.600Å
e4tudYT1[YT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.600Å
e4tueRT1[RT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.500Å
e4tueYT1[YT:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.500Å
e4z8c1T1[1T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.800Å
e4z8c2T1[2T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.800Å
e4zer1T1[1T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: ARG,MG ; X-RAY DIFFRACTION 3.100Å
e4zer2T1[2T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: ARG,MG ; X-RAY DIFFRACTION 3.100Å
e4z3q1T1[1T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH
e4z3q2T1[2T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH
e4z3r1T1[1T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH
e4z3r2T1[2T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH
e4z3s1T1[1T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.650Å
e4z3s2T1[2T:1-131] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.650Å
e4wq1B81[B8:2-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.100Å
e4wq1751[75:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.100Å
e4wqrB81[B8:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.150Å
e4wqr751[75:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.150Å
e4wr6B81[B8:2-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.050Å
e4wr6751[75:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.050Å
e4wraB81[B8:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.050Å
e4wra751[75:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.050Å
e4wroB81[B8:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.050Å
e4wsdB81[B8:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.950Å
e4wsd751[75:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 2.950Å
e4wsmB81[B8:1-129] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.300Å
e4wsm751[75:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.300Å
e4wt1B81[B8:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.050Å
e4wt1751[75:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.050Å
e4wu1B81[B8:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.200Å
e4wu1751[75:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.200Å
e4wzdB81[B8:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.100Å
e4wzd751[75:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.100Å
e4wzoB81[B8:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ligands: MG ; X-RAY DIFFRACTION 3.300Å
e4wzo751[75:1-137] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.300Å
e3ja1LR1[LR:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; ELECTRON MICROSCOPY
e4u67M1[M:2-109] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 3.65Å
e4woiBP1[BP:1-114] Image Pymol Jmol Links: PDB, SCOP, CATH, PubMed, DOI
50S ribosomal protein L19 ; X-RAY DIFFRACTION 2.900Å
Previous Next
Pseudo group of domains that do not map to PFam family profiles. Domains inside should not be considered as in one family.
beta meanderssingle beta-sheet with mainly meander topology
beta sandwichestwo beta-sheets stacked together to form a sandwich
beta duplicates or obligate multimersbeta duplicates or monomers associate together to form a compact domain
beta complex topologybeta domains with complex and unique topology that cannot be described as barrel or sandwich or meander
a+b two layersone alpha-helix layer and one beta-sheet layer
a+b three layersone mainly antiparallel beta-sheet layer sandwiched between two alpha-helix layers
a+b four layerstwo beta-sheet layers sandwiched between two alpha-helix layers
a+b complex topologyalpha and beta domain with complex and unique topology that cannot be described in layers
a+b duplicates or obligate multimersalpha and beta duplicates or monomers associated together to form a compact domain
a/b barrelsrepeating beta-alpha units form a barrel
a/b three-layered sandwichesrepeating beta-alpha units form a sandwich with a mainly parallel beta-sheet layer stacked between two alpha-helix layers
mixed a+b and a/balpha and beta domain consists of both a+b and a/b regions
few secondary structure elementsstabilized by cofactors or disulfides
extended segmentsextended, non-globular segments, frequently bind to other proteins to form complexes